Madison, WI Header
File #: 87669    Version: 1 Name: Accepting storm sewer and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Pankratz Street CSM (2202-2302 Pankratz Street), Private Contract No. 2312.
Type: Resolution Status: Items Referred
File created: 3/21/2025 In control: BOARD OF PUBLIC WORKS
On agenda: 4/2/2025 Final action:
Enactment date: Enactment #:
Title: Accepting storm sewer and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Pankratz Street CSM (2202-2302 Pankratz Street), Private Contract No. 2312 (District 12).
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. Pankratz CMS Storm Schedule A Unit Cost.pdf, 2. 2312 Street Schedule A excluding bituminous.pdf

Fiscal Note

No City Funds required. Private contract.

Title

Accepting storm sewer and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Pankratz Street CSM (2202-2302 Pankratz Street), Private Contract No. 2312 (District 12).

Body

WHEREAS, Wisconsin Secretary of Transportation as agent for Dane County, Wisconsin, has satisfactorily completed the installation of storm sewer and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Pankratz Street CSM (2202-2302 Pankratz Street).

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said storm sewer and street improvements (excluding bituminous surface pavement) be and are hereby accepted. 

 

2. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

 

Increase in Total Plant Value per Schedule “A”                     $64,150.91.

 

 

 

3. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:

 

 

                     Skuldt Street from International Lane to Pankratz Street.

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2312 by $ 44,442.20 for a useful life of 40 years