File #: 90752    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement on Lone Oak Lane and Honey Harvest Lane) constructed by Private Contract In Acacia Ridge Phase 10, Private Contract No. 9340.
Type: Resolution Status: Items Referred
File created: 11/6/2025 In control: BOARD OF PUBLIC WORKS
On agenda: 12/9/2025 Final action:
Enactment date: Enactment #:
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement on Lone Oak Lane and Honey Harvest Lane) constructed by Private Contract In Acacia Ridge Phase 10, Private Contract No. 9340 (District 1).
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. AR Ph 10 Storm Schedule A Unit Cost.pdf, 2. 9340 Street Schedule A including bituminous.pdf, 3. AR Ph 10 Sanitary Schedule A Unit Cost.pdf
Fiscal Note
No City Funds required. Private contract.
Title
Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement on Lone Oak Lane and Honey Harvest Lane) constructed by Private Contract In Acacia Ridge Phase 10, Private Contract No. 9340 (District 1).
Body
WHEREAS, East South Point, LLC, has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement on Lone Oak Lane and Honey Harvest Lane) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Acacia Ridge Phase 10.

NOW, THEREFORE, BE IT RESOLVED

1. That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement on Lone Oak Lane and Honey Harvest Lane) be and are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
and Miscellaneous Costs) $ 106,195.82

B) Contributions in Aid of Construction:
a) Public Sewer Components $ 106,195.82
b) Sewer Laterals $ ____-0-

C) Investments in Capital (MSU Share) $ ____-0-

D) Total Plant Value $ 106,195.82

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".

Increase in Total Plant Value per Schedule “A” $35,300.16.

4. That the street improvements (excluding bituminous surface pavement on Lone Oak Lane and Honey Harvest Lane) on the...