Madison, WI Header
File #: 84887    Version: 1 Name: Authorizing the Mayor and the City Clerk to execute Amendment No. 2 to the existing Purchase of Services contract between the City of Madison and Merjent, Inc. for engineering services for the Pheasant Branch Greenway Enhancement Design project.
Type: Resolution Status: Report of Officer
File created: 8/21/2024 In control: BOARD OF PUBLIC WORKS
On agenda: 9/10/2024 Final action:
Enactment date: Enactment #:
Title: Authorizing the Mayor and the City Clerk to execute Amendment No. 2 to the existing Purchase of Services contract between the City of Madison and Merjent, Inc. for engineering services for the Pheasant Branch Greenway Enhancement Design project. (District 9)
Sponsors: Nikki Conklin
Attachments: 1. Cost Table.pdf
Fiscal Note
The proposed resolution authorizes a second amendment to contract #9248 for engineering services for the Pheasant Branch Greenway Enhancement Design project. The original contract for engineering design services was adopted via RES-23-00230 (Legistar #76425) on 3/21/2023 for an estimated cost of $280,002. The first amendment added an additional $104,865 in costs, for a total of $384,867. The first amendment was approved via RES-24-00087 (Legistar #81601) on February 13, 2024. The proposed second amendment adds an additional $57,030 in costs for an updated total contract amount of $441,897. Funding for the original contract and amendments is available in the Stormwater Utility Capital Budget projects #12568 and #14370. No additional appropriation is required.
Title
Authorizing the Mayor and the City Clerk to execute Amendment No. 2 to the existing Purchase of Services contract between the City of Madison and Merjent, Inc. for engineering services for the Pheasant Branch Greenway Enhancement Design project. (District 9)
Body
The City of Madison Engineering Division identified the Pheasant Branch Greenway project area as an area with the potential for storage and conveyance improvements to be made that will have the effect of mitigating flooding. The occurrence of flooding has been observed over the past decade and was confirmed by the Pheasant Branch Watershed Study. The ponds in the greenway system have also accumulated sediment and need to be dredged to improve their efficiency of nutrient removal and stormwater detention.
The City entered into an agreement with Merjent, Inc. for engineering services for the Pheasant Branch Greenway Enhancement Design (RES-20-00230). This contract was previously amended with RES-24-00087. The City Engineer requested additional engineering services and recommend that they be undertaken by Merjent, Inc. for the Pheasant Branch Greenway Enhancement Design as defined below:

1. Additional permitting services for WDNR ...