Madison, WI Header
File #: 86049    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Acacia Ridge - Phase 8, Private Contract No. 9215.
Type: Resolution Status: Items Referred
File created: 11/12/2024 In control: BOARD OF PUBLIC WORKS
On agenda: 12/10/2024 Final action:
Enactment date: Enactment #:
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Acacia Ridge - Phase 8, Private Contract No. 9215 (District 9).
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 9215 Street Schedule A excluding bituminous.pdf, 2. Acacia Ridge Ph 8 Sanitary Schedule A Unit Cost.pdf, 3. Acacia Ridge Ph 8 Storm Schedule A Unit Cost.pdf

Fiscal Note

No City Funds required. Private contract.

Title

Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Acacia Ridge - Phase 8, Private Contract No. 9215 (District 9).

Body

WHEREAS, East South Point, LLC, has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  Acacia Ridge - Phase 8.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted. 

 

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service". 

 

SANITARY SEWER ACCOUNTING DATA

 

A)                     Total Contract Value (including Engineering

                     and Miscellaneous Costs)                                                               $                     143,185.73                     

 

B)                     Contributions in Aid of Construction:

                     a)                     Public Sewer Components                                          $                     143,185.73                     

                     b)                     Sewer Laterals                                                               $                     ____-0-                     

 

C)                     Investments in Capital (MSU Share)                     $                     ____-0-                     

 

D)                     Total Plant Value                                                                                    $                     143,185.73                     

 

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

 

Increase in Total Plant Value per Schedule “A”                     $260,443.87.

 

 

 

4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:

 

 

                     Redan Drive from 130 FT S of Clear Rise BLVD (S) to Tawny Acorn Drive.

                     Redan Drive from Tawny Acorn Drive to Redan Drive.

                     Redan Drive from Rustic Pine Drive to South Lot Line of Lot 475.

                     Tawny Acorn Drive from 212 FT E of Seven Winds Trail to Redan Drive.

                     Rustic Pine Road from Redan Drive to White Sky Pass.

                     Rustic Pine Road from White Sky Pass to E Lot Line of Lot 505.

                     White Sky Pass from Rustic Pine Drive to E of Lot 478.

                     Lone Oak - White Sky Pass Alley (N) from White Sky Pass to E Lot Line of Lot 520.

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 14342 by $156,136.99 for a useful life of 40 years.