Madison, WI Header
File #: 65069    Version: 1 Name: An agreement with WisDOT for the design and construction for safety improvements at the Gammon Rd & Watts Rd intersection through Highway Safety Improvement Program (HSIP) Project, I.D. 5992-07-18/19. (1st & 19th Ads).
Type: Resolution Status: Passed
File created: 4/13/2021 In control: BOARD OF PUBLIC WORKS
On agenda: 5/4/2021 Final action: 5/4/2021
Enactment date: 5/10/2021 Enactment #: RES-21-00318
Title: Authorizing the Mayor and City Clerk to execute an agreement with the State of Wisconsin Department of Transportation for the design and construction for safety improvements at the Gammon Rd & Watts Rd intersection through Highway Safety Improvement Program (HSIP) Project, I.D. 5992-07-18/19. (1st & 19th Ads).
Sponsors: Satya V. Rhodes-Conway, Keith Furman, Barbara Harrington-McKinney, Syed Abbas, Sheri Carter, Gary Halverson
Fiscal Note
The proposed resolution authorizes an agreement with the State of Wisconsin Department of Transportation for the design and construction of safety improvements at the Gammon Rd & Watts Rd intersection. The project will be designed in 2021 and constructed in 2022. The total estimated project cost is $708,039, of which $70,804 ($7,500 in 2021 design costs and $63,304 in 2022 for construction costs) is the City share. The State would administer the construction contract and would bill the City for its share of the project.

Funds for the City’s 2021 share ($7,500) are available in the adopted capital budget for Traffic Engineering - Vision Zero Program. Funds for the 2022 share ($63,304) would be available in the 2022 Vision Zero program identified in the Capital Improvement Plan. No additional appropriation is required.
Title
Authorizing the Mayor and City Clerk to execute an agreement with the State of Wisconsin Department of Transportation for the design and construction for safety improvements at the Gammon Rd & Watts Rd intersection through Highway Safety Improvement Program (HSIP) Project, I.D. 5992-07-18/19. (1st & 19th Ads).
Body
WHEREAS, The city of Madison Traffic Engineering is proposing safety improvements to the Gammon Rd & Watts Rd intersection. The improvements include reconstruction of the left-turn bays to provide a positive left-turn offset, replacing the current signal head configuration with over-the-lane signal heads and high visibility crosswalks; and,

WHEREAS, The project was awarded a grant under WisDOT’s Highway Safety Improvement Program (HSIP) that will be responsible for 90% of the participating design and construction costs, and the City is responsible for 10% of the costs; and,

WHEREAS, The proposed project is planned to be designed in 2021 and to be constructed in 2022,

NOW THEREFORE BE IT RESOLVED that the Mayor and City Clerk are hereby authorized to execute an agreement with the State of Wisconsin Department of ...

Click here for full text