File #: 49810    Version: 1 Name: Accepting storm sewer and street improvements (including bituminous surface pavement) constructed by Private Contract in: Secret Places - Phase 12, Private Contract No. 2398.
Type: Resolution Status: Passed
File created: 12/8/2017 In control: BOARD OF PUBLIC WORKS
On agenda: 1/2/2018 Final action: 1/2/2018
Enactment date: 1/5/2018 Enactment #: RES-18-00025
Title: Accepting storm sewer and street improvements (including bituminous surface pavement) constructed by Private Contract in: Secret Places - Phase 12, Private Contract No. 2398.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2398 complete Schedule A.pdf, 2. 2398 Secret Places Ph 12 Storm Schedule A Unit Cost.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
1/2/20181 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
12/13/20171 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
12/8/20171 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

Private Contract, No Appropriation Required.

Title

Accepting storm sewer and street improvements (including bituminous surface pavement) constructed by Private Contract in: Secret Places - Phase 12, Private Contract No. 2398.

Body

WHEREAS, MREC VH Madison, LLC, has satisfactorily completed the installation of storm sewer and street improvements (including bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  Secret Places - Phase 12.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

1.  That said storm sewer and street improvements (including bituminous surface pavement) be and are hereby accepted. 

 

2. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service". 

 

 

Increase in Total Plant Value per Schedule “A”                     $16,920.55.

 

 

4. That the street improvements, including the bituminous pavement, on the following streets be and are hereby accepted:

 

                     Catalina Parkway from the N line of Lot 181 to the S line of Lot 188

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2398  $ 58,112.64 for a useful life of 40 years.