Madison, WI Header
File #: 31703    Version: 1 Name: Recreate the 1.0 FTE position of Hydrogeologist 1, #1703, in CG18-08, as a Hydrogeologist 3, CG18-10.
Type: Resolution Status: Passed
File created: 9/23/2013 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 11/19/2013 Final action: 11/19/2013
Enactment date: 11/20/2013 Enactment #: RES-13-00841
Title: Recreate the 1.0 FTE position of Hydrogeologist 1, #1073 (occupied by B. Bemis), in CG18-08, as a Hydrogeologist 3, CG18-10 in the Engineering Division budget. Reallocate the respective incumbent of position #1073 to the new position.
Sponsors: Paul R. Soglin
Attachments: 1. PBMemo Hydrogeologist Series 10-2013.pdf, 2. Hydrogeologist 1.pdf, 3. Hydrogeologist 2.pdf, 4. Hydrogeologist 3.pdf, 5. Hydrogeologist 4.pdf, 6. Hydrogeologist 3 Position Description.pdf
Fiscal Note
Annualized costs are projected at $6,682, or $9,134 including benefits.  Costs will be accommodated by the management of salary savings.
 
Title
Recreate the 1.0 FTE position of Hydrogeologist 1, #1073 (occupied by B. Bemis), in CG18-08, as a Hydrogeologist 3, CG18-10 in the Engineering Division budget. Reallocate the respective incumbent of position #1073 to the new position.
 
Body
Resolution that the 1.0 FTE position of Hydrogeologist 1, #1073 (occupied by B. Bemis), in CG18-08, shall be deleted and recreated as a Hydrogeologist 3, CG18-10 in the permanent salary detail of the Engineering Division budget. The respective incumbent of position #1073 shall be reallocated to the new position.